| Jun 30, 2026 | Jul 20, 2026 20 days | Not confirmed | Claim service & handlingUnsatisfactory settlement or offerRoofHail | Question of fact |
| Jun 26, 2026 | Jul 10, 2026 14 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offer | Question of factContract language / legal issueCompany position upheld |
| Jun 24, 2026 | Jul 24, 2026 30 days | Confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerLoss of useAdjuster's handling | Additional monies receivedAdditional Payment ExpectedCorrective action taken |
| Jun 22, 2026 | Jul 7, 2026 15 days | Not confirmed | Claim denialRoofWater damageLoss of use | Company position upheldInformation furnishedContract language / legal issue |
| Jun 18, 2026 | Jul 13, 2026 25 days | Not confirmed | Claim service & handlingDelay — claims handlingWater damageMoldAdjuster's handling | Information furnishedContract language / legal issueAdditional Payment Expected |
| Jun 15, 2026 | Jul 16, 2026 31 days | Not confirmed | Claim denialWater damageDamage disputePlumbingAdjuster's handling | Contract language / legal issueInformation furnishedCompany position upheld |
| Jun 15, 2026 | Jul 16, 2026 31 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerRoofHailDeductibleAdjuster's handling | Contract language / legal issueCompany position upheld |
| Jun 10, 2026 | Jun 16, 2026 6 days | Not confirmed | Claim service & handlingClaim denialWater damagePlumbingLoss of useAdjuster's handling | Information furnishedCompany position upheldContract language / legal issue |
| Jun 10, 2026 | Jul 1, 2026 21 days | Not confirmed | Policyholder serviceDelays (Underwriting)Refund of premium | Premium RefundedCompany position upheldQuestion of fact |
| Jun 8, 2026 | Jun 26, 2026 18 days | Confirmed | CancellationPremium & rating | Corrective action takenPremium Refunded |
| Jun 5, 2026 | Jul 7, 2026 32 days | Not confirmed | Claim service & handlingUnsatisfactory settlement or offerWater damageLoss of useAdjuster's handling | Additional monies receivedContract language / legal issueQuestion of fact |
| Jun 1, 2026 | Jun 18, 2026 17 days | Confirmed | Delay — claims handlingUnsatisfactory settlement or offerRoofHail | Additional Payment ExpectedCorrective action takenInformation furnished |
| May 22, 2026 | Jul 1, 2026 40 days | Not confirmed | Unsatisfactory settlement or offerRoofHailWindDeductible | Contract language / legal issueAdditional Payment ExpectedCompany position upheld |
| May 21, 2026 | Jun 10, 2026 20 days | Not confirmed | Unsatisfactory settlement or offerRoofHailWindDamage disputeDepreciation | Company position upheldQuestion of factContract language / legal issue |
| May 20, 2026 | Jun 10, 2026 21 days | Confirmed | Claim service & handlingDelay — claims handlingClaim denialAdjuster's handling | Company position upheldContract language / legal issue |
| May 19, 2026 | Jun 12, 2026 24 days | Not confirmed | Policyholder serviceEndorsement / RiderPremium & ratingRoofHailWindDeductible | Contract language / legal issueInformation furnishedCompany position upheld |
| May 18, 2026 | Jun 3, 2026 16 days | Not confirmed | Claim service & handlingClaim denialEndorsement / RiderPremium & ratingRoofHailDeductibleAdjuster's handling | Company position upheldInformation furnishedContract language / legal issue |
| May 15, 2026 | Jun 5, 2026 21 days | Not confirmed | Claim service & handlingUnsatisfactory settlement or offerRoofHailDamage disputeAdjuster's handling | Question of factContract language / legal issueCompany position upheld |
| May 11, 2026 | May 28, 2026 17 days | Confirmed | Claim service & handlingClaim denialUnsatisfactory settlement or offerRoofHailDepreciationAdjuster's handling | Corrective action takenInformation furnished |
| May 11, 2026 | Jun 8, 2026 28 days | Not confirmed | Claim service & handling | Contract language / legal issueInformation furnishedQuestion of fact |
| May 7, 2026 | May 27, 2026 20 days | Not confirmed | Cancellation | Contract language / legal issueQuestion of factInformation furnished |
| May 4, 2026 | May 21, 2026 17 days | Not confirmed | Claim service & handlingUnsatisfactory settlement or offerWater damagePlumbingAdjuster's handling | Question of factContract language / legal issueCompany position upheld |
| Apr 23, 2026 | May 19, 2026 26 days | Confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerAdjuster's handling | Contract language / legal issueInformation furnishedClaim settled |
| Apr 20, 2026 | May 7, 2026 17 days | Not confirmed | Claim service & handlingUnsatisfactory settlement or offerRoofHailWindDamage disputeAdjuster's handling | Company position upheldContract language / legal issueQuestion of fact |
| Apr 16, 2026 | May 11, 2026 25 days | Not confirmed | Claim service & handlingWater damagePlumbingDepreciationAdjuster's handling | Company position upheldInformation furnishedQuestion of fact |
| Mar 30, 2026 | May 5, 2026 36 days | Confirmed | Policyholder serviceDelay — policyholder serviceRefund of premium | Premium RefundedInformation furnishedCorrective action taken |
| Mar 25, 2026 | Apr 29, 2026 35 days | Not confirmed | Use of Credit ReportsAdjuster's handling | Information furnishedQuestion of fact |
| Mar 20, 2026 | Apr 14, 2026 25 days | Not confirmed | Claim service & handlingUnsatisfactory settlement or offerWater damagePlumbingMoldFoundationAdjuster's handling | Company position upheldContract language / legal issue |
| Mar 17, 2026 | Apr 16, 2026 30 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerWater damagePlumbingLoss of useMoldAdjuster's handling | Question of factContract language / legal issueCompany position upheld |
| Mar 11, 2026 | Apr 10, 2026 30 days | Not confirmed | Unsatisfactory settlement or offerRoofHailWind | Information furnishedCompany position upheldContract language / legal issue |
| Mar 5, 2026 | Apr 14, 2026 40 days | Not confirmed | Policyholder serviceUse of Credit Reports | Company position upheldInformation furnishedContract language / legal issue |
| Feb 26, 2026 | Mar 18, 2026 20 days | Not confirmed | Premium & ratingUse Of Clue Reports | Company position upheldContract language / legal issueInformation furnished |
| Feb 24, 2026 | Mar 25, 2026 29 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerRoofHailDamage disputeAdjuster's handling | Contract language / legal issueQuestion of factCompany position upheld |
| Feb 13, 2026 | Mar 12, 2026 27 days | Not confirmed | Claim service & handlingClaim denialWater damagePlumbingAdjuster's handling | Contract language / legal issueInformation furnishedCompany position upheld |
| Feb 5, 2026 | Mar 20, 2026 43 days | Confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerRoofDepreciationAdjuster's handling | Information furnishedCorrective action takenAdditional monies received |
| Feb 4, 2026 | Feb 27, 2026 23 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerRoofAppraisalDepreciation | Company position upheldContract language / legal issueQuestion of fact |
| Feb 3, 2026 | Mar 19, 2026 44 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerRoofDamage disputeDeductibleDepreciationAdjuster's handling | Company position upheldContract language / legal issueQuestion of fact |
| Jan 28, 2026 | Mar 17, 2026 48 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerRoofWindDamage disputeAppraisalAdjuster's handling | Additional Payment ExpectedContract language / legal issueQuestion of fact |
| Jan 16, 2026 | Mar 17, 2026 60 days | Not confirmed | CancellationPolicyholder serviceAdjuster's handling | Information furnishedQuestion of fact |
| Jan 13, 2026 | Mar 12, 2026 58 days | Not confirmed | Claim service & handlingUnsatisfactory settlement or offerRoofHailDamage disputeAdjuster's handling | Contract language / legal issueInformation furnishedCompany position upheld |
| Dec 31, 2025 | Jan 22, 2026 22 days | Not confirmed | Claim service & handlingUnsatisfactory settlement or offerRoofHailDepreciationAdjuster's handling | Contract language / legal issueQuestion of factCompany position upheld |
| Dec 22, 2025 | Feb 23, 2026 63 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerHailWindDamage disputeAdjuster's handling | Company position upheldContract language / legal issueQuestion of fact |
| Dec 10, 2025 | Jan 28, 2026 49 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerWater damagePlumbingDeductibleLoss of use | Information furnishedCompany position upheldContract language / legal issue |
| Dec 8, 2025 | Feb 5, 2026 59 days | Not confirmed | Claim service & handlingPolicyholder serviceDelay — claims handlingPremium & ratingUnsatisfactory settlement or offerWater damagePlumbingDeductibleLoss of useAdjuster's handling | Additional Payment ExpectedQuestion of factContract language / legal issue |
| Dec 8, 2025 | Feb 24, 2026 78 days | Not confirmed | Delay — claims handlingRoofHail | Company position upheldContract language / legal issue |
| Nov 25, 2025 | Mar 9, 2026 104 days | Confirmed | Policyholder servicePremium & rating | Contract language / legal issueCompany position upheldInformation furnished |
| Nov 24, 2025 | Jan 29, 2026 66 days | Confirmed | Policyholder serviceDelay — policyholder serviceRefund of premium | Contract language / legal issuePremium RefundedCorrective action taken |
| Nov 20, 2025 | Feb 24, 2026 96 days | Not confirmed | Claim denialWater damage | Question of factContract language / legal issueCompany position upheld |
| Nov 11, 2025 | Jan 5, 2026 55 days | Confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerRoofHailWindDamage disputeAppraisalDepreciationAdjuster's handling | Additional Payment ExpectedContract language / legal issueQuestion of fact |
| Nov 11, 2025 | Feb 4, 2026 85 days | Not confirmed | Claim service & handlingUnsatisfactory settlement or offerWater damagePlumbingAdjuster's handling | Question of factCompany position upheldContract language / legal issue |
| Nov 10, 2025 | Feb 6, 2026 88 days | Not confirmed | Claim service & handlingClaim denialWater damagePlumbingAdjuster's handling | Contract language / legal issueQuestion of fact |
| Nov 6, 2025 | Dec 30, 2025 54 days | Not confirmed | Claim service & handlingClaim denialRoofHail | Company position upheldContract language / legal issue |
| Nov 4, 2025 | Jan 13, 2026 70 days | Not confirmed | Claim service & handlingUnsatisfactory settlement or offerRoofHailDamage disputeAdjuster's handling | Contract language / legal issueCompany position upheld |
| Oct 23, 2025 | Feb 10, 2026 110 days | Confirmed | Unsatisfactory settlement or offerWater damagePlumbing | Corrective action takenAdditional monies receivedInformation furnished |
| Oct 16, 2025 | Dec 9, 2025 54 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerHailAdjuster's handling | Question of factInformation furnished |
| Oct 13, 2025 | Dec 4, 2025 52 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerRoof | Contract language / legal issueInformation furnished |
| Oct 9, 2025 | Dec 30, 2025 82 days | Not confirmed | Policyholder serviceDelay — policyholder service | Question of factCompany position upheldContract language / legal issue |
| Oct 7, 2025 | Jan 16, 2026 101 days | Not confirmed | Premium & ratingRoofHailWind | Claim settledQuestion of factContract language / legal issue |
| Oct 7, 2025 | Feb 4, 2026 120 days | Not confirmed | Claim service & handlingClaim denialRoofWater damage | Question of factCompany position upheldContract language / legal issue |
| Oct 6, 2025 | Dec 8, 2025 63 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerWater damageLoss of useMoldAdjuster's handling | Contract language / legal issueQuestion of factInformation furnished |
| Oct 3, 2025 | Nov 24, 2025 52 days | Not confirmed | Claim service & handlingClaim denialRoofHailWater damageWindAdjuster's handling | Contract language / legal issueCompany position upheldInformation furnished |
| Sep 22, 2025 | Jan 9, 2026 109 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerRoofWindDeductibleDepreciationAdjuster's handling | Question of factCompany position upheldContract language / legal issue |
| Sep 9, 2025 | Jan 7, 2026 120 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offer | Additional monies receivedCompany position upheldQuestion of fact |
| Sep 3, 2025 | Dec 19, 2025 107 days | Confirmed | Policyholder serviceDelay — policyholder serviceRefund of premium | Corrective action takenCompany position upheldQuestion of fact |
| Aug 28, 2025 | Jan 13, 2026 138 days | Not confirmed | Claim service & handlingPolicyholder serviceDelay — claims handlingPremium & ratingRefund of premiumRoofDeductibleAdjuster's handling | Company position upheldQuestion of factInformation furnished |
| Aug 26, 2025 | Dec 18, 2025 114 days | Not confirmed | Claim service & handlingPolicyholder servicePremium & ratingAdjuster's handling | Information furnishedCompany position upheld |
| Aug 22, 2025 | Dec 9, 2025 109 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerWater damagePlumbingLoss of useMoldAdjuster's handling | Additional Payment ExpectedAppraisal Process InvokedCompany position upheld |
| Aug 13, 2025 | Sep 25, 2025 43 days | Not confirmed | Claim denialRoofWindDamage disputeDeductible | Contract language / legal issueCompany position upheldQuestion of fact |
| Aug 8, 2025 | Dec 5, 2025 119 days | Not confirmed | Claim service & handlingClaim denialWindAdjuster's handling | Information furnishedCompany position upheldContract language / legal issue |
| Aug 8, 2025 | Nov 10, 2025 94 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerRoofWindDepreciationAdjuster's handling | Question of factAdditional Payment ExpectedContract language / legal issue |
| Aug 2, 2025 | Dec 3, 2025 123 days | Not confirmed | Claim service & handlingUnsatisfactory settlement or offerRoofHailDepreciationAdjuster's handling | Contract language / legal issueCompany position upheld |
| Jul 30, 2025 | Aug 27, 2025 28 days | Not confirmed | Claim service & handlingDelay — claims handlingAdjuster's handling | Additional Payment ExpectedQuestion of factContract language / legal issue |
| Jul 30, 2025 | Oct 8, 2025 70 days | Not confirmed | Claim denialWater damageMold | Contract language / legal issueCompany position upheldQuestion of fact |
| Jul 29, 2025 | Oct 29, 2025 92 days | Not confirmed | Claim service & handlingUse Of Clue ReportsWater damageDepreciation | Company position upheldInformation furnishedContract language / legal issue |
| Jul 24, 2025 | Oct 10, 2025 78 days | Not confirmed | Claim service & handlingDelay — claims handlingRoofHailWater damageDamage disputeDepreciationLoss of useMold | Contract language / legal issueQuestion of fact |
| Jul 22, 2025 | Aug 15, 2025 24 days | Not confirmed | Claim service & handlingClaim denialRoofWater damageAdjuster's handling | Information furnishedContract language / legal issueQuestion of fact |
| Jul 18, 2025 | Sep 18, 2025 62 days | Not confirmed | Claim service & handlingPolicyholder servicePremium & ratingUnsatisfactory settlement or offerRoofDepreciationAdjuster's handling | Question of factContract language / legal issueCompany position upheld |
| Jul 18, 2025 | Nov 19, 2025 124 days | Not confirmed | Claim service & handlingDelay — claims handlingClaim denialWater damagePlumbingAdjuster's handling | Information furnishedContract language / legal issue |
| Jul 15, 2025 | Nov 6, 2025 114 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerWater damageDamage disputePlumbingDeductibleMoldAdjuster's handling | Contract language / legal issueQuestion of factCompany position upheld |
| Jul 14, 2025 | Nov 25, 2025 134 days | Confirmed | Claim service & handlingUnsatisfactory settlement or offerRoofHailWindDamage disputeAdjuster's handling | Contract language / legal issueQuestion of factCompany position upheld |
| Jul 8, 2025 | Sep 10, 2025 64 days | Confirmed | Unsatisfactory settlement or offerRoofHailAdjuster's handling | Contract language / legal issueCorrective action takenInformation furnished |
| Jul 7, 2025 | Nov 5, 2025 121 days | Not confirmed | Claim service & handlingClaim denialRoofHailWater damageWindAdjuster's handling | Contract language / legal issueQuestion of factCompany position upheld |
| Jul 7, 2025 | Nov 4, 2025 120 days | Not confirmed | Claim denialPolicy ExclusionWater damagePlumbingMold | Contract language / legal issueQuestion of fact |
| Jul 3, 2025 | Sep 3, 2025 62 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerDepreciationLoss of useAdjuster's handling | Contract language / legal issueCompany position upheldAdditional monies received |
| Jul 3, 2025 | Sep 2, 2025 61 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerRoofHailDepreciationAdjuster's handling | Company position upheldQuestion of factContract language / legal issue |
| Jul 1, 2025 | Aug 13, 2025 43 days | Not confirmed | Claim service & handlingRoofHailAdjuster's handling | Claim settledContract language / legal issueCompany position upheld |
| Jun 30, 2025 | Nov 3, 2025 126 days | Not confirmed | Claim service & handlingDelay — claims handlingRoofDeductibleDepreciationAdjuster's handling | Contract language / legal issueQuestion of fact |
| Jun 26, 2025 | Oct 27, 2025 123 days | Not confirmed | Premium & ratingRefund of premiumRoofHailDeductible | Contract language / legal issueCompany position upheld |
| Jun 6, 2025 | Sep 22, 2025 108 days | Not confirmed | Claim service & handlingDelay — claims handlingAdjuster's handling | Information furnishedQuestion of factClaim settled |
| Jun 4, 2025 | Jun 27, 2025 23 days | Not confirmed | Claim service & handling | Contract language / legal issueCompany position upheld |
| Jun 4, 2025 | Oct 2, 2025 120 days | Not confirmed | Policyholder serviceDelay — policyholder service | Company position upheldPremium RefundedQuestion of fact |
| May 28, 2025 | Sep 16, 2025 111 days | Not confirmed | Premium & ratingRoofHail | Company position upheldInformation furnished |
| May 20, 2025 | Sep 11, 2025 114 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerWater damagePlumbingDepreciationAdjuster's handling | Question of factCompany position upheldContract language / legal issue |
| May 20, 2025 | Sep 11, 2025 114 days | Not confirmed | Policyholder serviceUnsatisfactory settlement or offer | Question of factContract language / legal issue |
| May 20, 2025 | Sep 25, 2025 128 days | Not confirmed | Claim denial | Company position upheldInformation furnished |
| May 13, 2025 | Jul 17, 2025 65 days | Not confirmed | Policyholder service | Information furnishedQuestion of fact |
| Apr 30, 2025 | Aug 20, 2025 112 days | Not confirmed | Use Of Clue Reports | Contract language / legal issueInformation furnishedCompany position upheld |
| Apr 25, 2025 | Aug 5, 2025 102 days | Confirmed | Claim service & handlingDelay — claims handlingRoofWindAdjuster's handling | Information furnishedContract language / legal issueAdditional monies received |
| Apr 23, 2025 | Sep 11, 2025 141 days | Not confirmed | Endorsement / RiderNotice RequirementsUnsatisfactory settlement or offerRoofHailAdjuster's handling | Contract language / legal issueCompany position upheld |
| Apr 21, 2025 | Aug 18, 2025 119 days | Not confirmed | Claim service & handlingDelay — claims handlingPolicy ExclusionUnsatisfactory settlement or offerRoofWater damageDamage disputeLoss of useMoldAdjuster's handling | Contract language / legal issueCompany position upheldQuestion of fact |
| Apr 14, 2025 | May 28, 2025 44 days | Not confirmed | Claim service & handlingUnsatisfactory settlement or offerRoofHailAdjuster's handling | Information furnishedContract language / legal issueCompany position upheld |
| Apr 9, 2025 | Jul 17, 2025 99 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerWater damageLoss of use | Information furnishedContract language / legal issueAdditional monies received |
| Apr 1, 2025 | Jun 23, 2025 83 days | Not confirmed | Endorsement / RiderUnsatisfactory settlement or offerRoofHailWater damageDamage disputeAdjuster's handling | Company position upheldQuestion of factContract language / legal issue |
| Mar 7, 2025 | May 26, 2025 80 days | Not confirmed | Premium & rating | Company position upheldReferred ToInformation furnished |
| Mar 6, 2025 | Jul 16, 2025 132 days | Not confirmed | Claim service & handlingPremium & ratingUnsatisfactory settlement or offerRoofHailDepreciation | Information furnishedContract language / legal issue |
| Feb 24, 2025 | Jul 8, 2025 134 days | Confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerWater damageDeductibleLoss of useAdjuster's handling | Additional monies receivedContract language / legal issueCorrective action taken |
| Feb 20, 2025 | May 21, 2025 90 days | Not confirmed | Unsatisfactory settlement or offerRoofHailAppraisalAdjuster's handling | Question of factContract language / legal issue |
| Feb 7, 2025 | Feb 26, 2025 19 days | Not confirmed | Misleading AdvertisingOther | Corrective action takenInformation furnished |
| Jan 14, 2025 | Feb 10, 2025 27 days | Not confirmed | Premium & ratingRefund of premium | Company position upheld |
| Jan 10, 2025 | May 30, 2025 140 days | Confirmed | Premium & rating | Company position upheldPremium RefundedCorrective action taken |
| Jan 6, 2025 | Apr 29, 2025 113 days | Not confirmed | Claim denialRoofWater damageWind | Company position upheldQuestion of factContract language / legal issue |
| Dec 30, 2024 | Jan 17, 2025 18 days | Not confirmed | Policyholder serviceRefund of premium | Premium RefundedCompany position upheldContract language / legal issue |
| Dec 23, 2024 | Jan 17, 2025 25 days | Confirmed | Non-Renewal | Referred ToContract language / legal issueInformation furnished |
| Dec 19, 2024 | Jun 2, 2025 165 days | Not confirmed | Delay — claims handlingUnsatisfactory settlement or offerRoofHailDeductibleDepreciationAdjuster's handling | Contract language / legal issueCompany position upheldInformation furnished |
| Dec 18, 2024 | Apr 22, 2025 125 days | Not confirmed | Delay — policyholder serviceRefund of premium | Question of factCompany position upheldContract language / legal issue |
| Dec 10, 2024 | Feb 27, 2025 79 days | Not confirmed | Refund of premium | Contract language / legal issueCompany position upheldQuestion of fact |
| Dec 6, 2024 | Jan 16, 2025 41 days | Confirmed | Non-Renewal | Non-renewal rescindedInformation furnishedReferred To |
| Dec 6, 2024 | Mar 28, 2025 112 days | Not confirmed | Claim denialRoofDeductible | Contract language / legal issueCompany position upheldInformation furnished |
| Dec 5, 2024 | Apr 16, 2025 132 days | Not confirmed | Policyholder serviceClaim denialRefund of premiumWater damagePlumbingAdjuster's handling | Contract language / legal issueCompany position upheldQuestion of fact |
| Nov 25, 2024 | Feb 18, 2025 85 days | Confirmed | Unsatisfactory settlement or offerRoofHailDepreciation | Corrective action takenContract language / legal issueInformation furnished |