| Jul 6, 2026 | Jul 23, 2026 17 days | Not confirmed | Claim service & handlingUnsatisfactory settlement or offerAdjuster's handling | Additional Payment ExpectedQuestion of fact |
| Jul 2, 2026 | Jul 23, 2026 21 days | Confirmed | Claim service & handlingDelay — claims handlingLoss of useAdjuster's handling | Corrective action takenAdditional monies receivedContract language / legal issue |
| Jun 29, 2026 | Jul 23, 2026 24 days | Confirmed | Policyholder serviceDelays (Underwriting)Premium & ratingRefund of premiumRoof | Premium RefundedCorrective action takenContract language / legal issue |
| Jun 26, 2026 | Jul 22, 2026 26 days | Confirmed | CancellationPolicyholder serviceDelay — policyholder serviceDelays (Underwriting)Refund of premium | Contract language / legal issueInformation furnishedPremium Refunded |
| Jun 22, 2026 | Jul 20, 2026 28 days | Not confirmed | Claim service & handlingDelay — claims handlingRoofHailAppraisalAdjuster's handling | Contract language / legal issueInformation furnished |
| Jun 17, 2026 | Jul 7, 2026 20 days | Confirmed | Claim service & handlingDelay — claims handlingWater damageAdjuster's handling | Claim settledInformation furnishedContract language / legal issue |
| Jun 16, 2026 | Jul 9, 2026 23 days | Confirmed | Claim service & handlingDelay — claims handlingWater damagePlumbing | Information furnishedAdditional monies receivedCorrective action taken |
| Jun 10, 2026 | Jun 29, 2026 19 days | Confirmed | Claim service & handlingDelay — claims handlingAdjuster's handling | Corrective action takenClaim settled |
| Jun 9, 2026 | Jul 24, 2026 45 days | Confirmed | Delay — claims handlingClaim denialLiability DisputeWindDamage disputeAppraisal | Claim settledContract language / legal issueCompany position upheld |
| May 27, 2026 | Jun 22, 2026 26 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerHailWindDeductibleAppraisal | Question of factContract language / legal issueInformation furnished |
| May 22, 2026 | Jun 18, 2026 27 days | Confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerAppraisalAdjuster's handling | Claim settledCorrective action takenContract language / legal issue |
| May 20, 2026 | Jun 9, 2026 20 days | Confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerRoofHailAdjuster's handling | Corrective action takenInformation furnished |
| May 20, 2026 | Jun 10, 2026 21 days | Confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerDamage disputeLoss of useAdjuster's handling | Corrective action takenContract language / legal issueQuestion of fact |
| May 19, 2026 | Jun 10, 2026 22 days | Not confirmed | Claim service & handlingUnsatisfactory settlement or offerRoofWindAdjuster's handling | Company position upheldContract language / legal issue |
| May 18, 2026 | Jun 9, 2026 22 days | Confirmed | Policyholder serviceDelays (Underwriting)Deductible | Corrective action takenInformation furnished |
| May 14, 2026 | Jun 26, 2026 43 days | Not confirmed | Claim service & handlingPolicyholder serviceUnsatisfactory settlement or offerAppraisal | Company position upheldContract language / legal issue |
| May 13, 2026 | May 29, 2026 16 days | Not confirmed | Claim service & handlingDelay — claims handlingClaim denialHailWater damageWindAdjuster's handling | Company position upheldContract language / legal issueQuestion of fact |
| May 8, 2026 | Jun 1, 2026 24 days | Confirmed | Claim service & handlingDelay — claims handlingPrompt PayUnsatisfactory settlement or offerRoofHailWindAdjuster's handling | Contract language / legal issueCorrective action takenAdditional monies received |
| May 4, 2026 | May 28, 2026 24 days | Confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerRoofWater damageMoldAdjuster's handling | Additional Payment ExpectedContract language / legal issueCorrective action taken |
| Apr 29, 2026 | May 18, 2026 19 days | Confirmed | Claim service & handlingDelay — claims handlingRoofHailWindAdjuster's handling | Company position upheldQuestion of factContract language / legal issue |
| Apr 29, 2026 | May 29, 2026 30 days | Confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerWater damagePlumbingMoldAdjuster's handling | Information furnishedAdditional Payment ExpectedAdditional monies received |
| Apr 29, 2026 | May 15, 2026 16 days | Confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerDamage disputeAdjuster's handling | Information furnishedCompany position upheldQuestion of fact |
| Apr 27, 2026 | Jun 2, 2026 36 days | Confirmed | Claim service & handlingDelay — claims handlingAdjuster's handling | Corrective action takenClaim settled |
| Apr 20, 2026 | May 12, 2026 22 days | Not confirmed | Claim service & handlingDelay — claims handlingRoofWater damageAppraisalAdjuster's handling | Contract language / legal issueClaim settled |
| Apr 9, 2026 | Apr 23, 2026 14 days | Not confirmed | Delay — claims handlingUnsatisfactory settlement or offerRoofWater damageDamage disputeDeductibleAdjuster's handling | Question of factContract language / legal issueInformation furnished |
| Apr 8, 2026 | Apr 29, 2026 21 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerWater damagePlumbingAdjuster's handling | Contract language / legal issueClaim settled |
| Apr 2, 2026 | Apr 28, 2026 26 days | Confirmed | Claim denialWater damagePlumbing | Additional monies receivedCorrective action takenContract language / legal issue |
| Apr 1, 2026 | Apr 16, 2026 15 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerWater damageDeductibleAdjuster's handling | Information furnishedQuestion of factAdditional monies received |
| Mar 19, 2026 | Apr 8, 2026 20 days | Confirmed | Delay — claims handlingUnsatisfactory settlement or offerAdjuster's handling | Information furnishedClaim settledContract language / legal issue |
| Mar 19, 2026 | Apr 15, 2026 27 days | Not confirmed | Claim service & handlingUnsatisfactory settlement or offerWater damagePlumbingDeductibleAdjuster's handling | Contract language / legal issueCompany position upheldQuestion of fact |
| Mar 19, 2026 | Apr 13, 2026 25 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offer | Contract language / legal issueQuestion of fact |
| Feb 25, 2026 | Mar 20, 2026 23 days | Not confirmed | Claim service & handlingDelay — claims handlingWater damagePlumbingFoundationAdjuster's handling | Contract language / legal issueAdditional monies receivedQuestion of fact |
| Feb 24, 2026 | Mar 30, 2026 34 days | Confirmed | Claim service & handlingDelay — claims handlingWater damagePlumbingMold | Additional Payment ExpectedContract language / legal issueCorrective action taken |
| Feb 23, 2026 | Apr 2, 2026 38 days | Not confirmed | Claim service & handlingDelay — claims handlingAppraisal | Information furnishedContract language / legal issueAdditional Payment Expected |
| Feb 19, 2026 | Mar 25, 2026 34 days | Not confirmed | Premium & rating | Company position upheldInformation furnishedContract language / legal issue |
| Feb 12, 2026 | Mar 6, 2026 22 days | Confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerWater damageAppraisalDepreciation | Claim settledContract language / legal issueCorrective action taken |
| Feb 11, 2026 | Mar 4, 2026 21 days | Not confirmed | Claim service & handlingUnsatisfactory settlement or offerRoofHailWater damagePlumbingAppraisalAdjuster's handling | Company position upheldQuestion of factInformation furnished |
| Feb 9, 2026 | Mar 24, 2026 43 days | Confirmed | Delay — claims handlingUnsatisfactory settlement or offerAppraisal | Additional monies receivedCorrective action takenInformation furnished |
| Feb 9, 2026 | Mar 18, 2026 37 days | Not confirmed | Claim service & handlingDelay — claims handling | Question of factInformation furnished |
| Feb 5, 2026 | Feb 27, 2026 22 days | Not confirmed | Claim service & handlingDelay — claims handlingRoofHailWindAppraisalAdjuster's handling | Question of factInformation furnished |
| Feb 5, 2026 | Mar 2, 2026 25 days | Confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerRoofWind | Additional Payment ExpectedAdditional monies receivedCorrective action taken |
| Jan 20, 2026 | Feb 18, 2026 29 days | Not confirmed | Claim service & handlingDelay — claims handlingWater damageAdjuster's handling | Contract language / legal issueCompany position upheldAdditional Payment Expected |
| Dec 31, 2025 | Feb 3, 2026 34 days | Not confirmed | Claim service & handlingDelay — claims handlingClaim denialMoldAdjuster's handling | Company position upheldContract language / legal issue |
| Dec 22, 2025 | Feb 9, 2026 49 days | Not confirmed | Claim service & handlingUnsatisfactory settlement or offerRoofHailWindDamage disputeAdjuster's handling | Company position upheldClaim settledQuestion of fact |
| Dec 17, 2025 | Feb 24, 2026 69 days | Not confirmed | Unsatisfactory settlement or offerRoofWindAdjuster's handling | Contract language / legal issueCompany position upheldAdditional monies received |
| Dec 12, 2025 | Feb 23, 2026 73 days | Confirmed | Claim service & handlingClaim denialAdjuster's handling | Claim settledCorrective action taken |
| Dec 11, 2025 | Feb 19, 2026 70 days | Confirmed | Claim service & handlingUnsatisfactory settlement or offerDamage disputeAdjuster's handling | Claim settledCorrective action taken |
| Dec 9, 2025 | Jan 27, 2026 49 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerAdjuster's handling | Contract language / legal issueCompany position upheld |
| Dec 9, 2025 | Jan 27, 2026 49 days | Not confirmed | Claim service & handlingDelay — claims handlingWindLoss of use | Contract language / legal issueInformation furnishedAdditional Payment Expected |
| Dec 9, 2025 | Jan 23, 2026 45 days | Not confirmed | Claim service & handlingClaim denialUnsatisfactory settlement or offerWater damagePlumbing | Contract language / legal issueAdditional monies receivedQuestion of fact |
| Dec 8, 2025 | Dec 30, 2025 22 days | Not confirmed | Delay — claims handlingUnsatisfactory settlement or offerWater damageLoss of useMold | Question of factCompany position upheldContract language / legal issue |
| Dec 2, 2025 | Mar 9, 2026 97 days | Confirmed | Claim service & handlingDelay — claims handlingClaim denialPlumbingMold | Information furnishedCompany position upheldContract language / legal issue |
| Nov 25, 2025 | Feb 13, 2026 80 days | Not confirmed | Claim service & handlingPolicyholder serviceMisrepresentationUnsatisfactory settlement or offerUse Of Clue Reports | Contract language / legal issueQuestion of fact |
| Nov 12, 2025 | Jan 6, 2026 55 days | Confirmed | Claim service & handlingDelay — claims handlingAdjuster's handling | Additional Payment ExpectedContract language / legal issueCorrective action taken |
| Nov 4, 2025 | Feb 9, 2026 97 days | Confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerWater damageDamage disputePlumbingDepreciationAdjuster's handling | Additional monies receivedCorrective action takenContract language / legal issue |
| Oct 31, 2025 | Jan 9, 2026 70 days | Confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerWater damageDamage disputeAdjuster's handling | Corrective action takenClaim settledAdditional monies received |
| Oct 30, 2025 | Dec 5, 2025 36 days | Not confirmed | Claim denialWater damagePlumbingMold | Contract language / legal issueQuestion of factCompany position upheld |
| Oct 27, 2025 | Jan 28, 2026 93 days | Confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerRoofWater damageDamage disputeLoss of useAdjuster's handling | Contract language / legal issueCorrective action takenAdditional Payment Expected |
| Oct 20, 2025 | Nov 12, 2025 23 days | Not confirmed | Claim service & handlingDelay — claims handlingWater damageAdjuster's handling | Information furnishedAdditional monies receivedContract language / legal issue |
| Oct 17, 2025 | Jan 27, 2026 102 days | Not confirmed | Policyholder service | Information furnishedContract language / legal issueCompany position upheld |
| Oct 13, 2025 | Jan 29, 2026 108 days | Confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerWater damagePlumbingLoss of useMoldFoundation | Corrective action takenContract language / legal issueAdditional Payment Expected |
| Oct 10, 2025 | Jan 14, 2026 96 days | Confirmed | Claim service & handlingDelay — claims handlingWater damagePlumbingLoss of useAdjuster's handling | Information furnishedContract language / legal issueAdditional monies received |
| Oct 10, 2025 | Nov 4, 2025 25 days | Not confirmed | Claim service & handlingDelay — claims handlingAppraisalAdjuster's handling | Contract language / legal issueClaim settledCompany position upheld |
| Oct 8, 2025 | Oct 31, 2025 23 days | Not confirmed | Claim service & handlingClaim denialRoofHailAdjuster's handling | Question of factContract language / legal issueInformation furnished |
| Oct 2, 2025 | Oct 27, 2025 25 days | Not confirmed | Claim service & handlingDelay — claims handlingWater damagePlumbingAdjuster's handling | Contract language / legal issueClaim settledQuestion of fact |
| Sep 18, 2025 | Oct 13, 2025 25 days | Not confirmed | Claim service & handlingDelay — claims handlingRoofHailWindAdjuster's handling | Additional monies receivedQuestion of factInformation furnished |
| Sep 18, 2025 | Nov 4, 2025 47 days | Not confirmed | Claim service & handlingDelay — claims handlingWater damageLoss of use | Question of factInformation furnishedContract language / legal issue |
| Sep 17, 2025 | Oct 13, 2025 26 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerRoofHailDamage disputeDeductible | Company position upheldContract language / legal issueInformation furnished |
| Sep 12, 2025 | Jan 16, 2026 126 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerWater damagePlumbingDeductibleAdjuster's handling | Question of factCompany position upheldContract language / legal issue |
| Sep 11, 2025 | Jan 20, 2026 131 days | Not confirmed | Claim service & handlingClaim denialAdjuster's handling | Contract language / legal issueCompany position upheldInformation furnished |
| Sep 3, 2025 | Dec 15, 2025 103 days | Confirmed | Premium & ratingRefund of premiumRoof | Premium RefundedCorrective action takenInformation furnished |
| Sep 2, 2025 | Jan 12, 2026 132 days | Not confirmed | Premium & rating | Question of factContract language / legal issueCompany position upheld |
| Aug 28, 2025 | Dec 12, 2025 106 days | Not confirmed | Claim service & handlingDelay — claims handlingPrompt PayRoofWater damageAdjuster's handling | Additional Payment ExpectedAdditional monies receivedInformation furnished |
| Aug 26, 2025 | Nov 12, 2025 78 days | Not confirmed | Claim service & handlingDelay — claims handlingAdjuster's handling | Information furnishedQuestion of fact |
| Aug 26, 2025 | Dec 5, 2025 101 days | Confirmed | Claim service & handlingDelay — claims handlingWater damagePlumbingMoldAdjuster's handling | Contract language / legal issueClaim settledCorrective action taken |
| Aug 25, 2025 | Oct 8, 2025 44 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerAdjuster's handling | Question of factInformation furnished |
| Aug 20, 2025 | Oct 6, 2025 47 days | Not confirmed | Claim service & handlingClaim denialRoofWind | Company position upheldContract language / legal issueInformation furnished |
| Aug 14, 2025 | Sep 26, 2025 43 days | Confirmed | Claim service & handlingDelay — claims handlingRoofHail | Information furnishedContract language / legal issueAdditional monies received |
| Aug 13, 2025 | Sep 29, 2025 47 days | Not confirmed | Claim denialPolicy ExclusionWater damagePlumbing | Contract language / legal issueQuestion of fact |
| Aug 12, 2025 | Oct 21, 2025 70 days | Not confirmed | Claim service & handlingDelay — claims handlingWater damageAdjuster's handling | Question of factClaim settledContract language / legal issue |
| Aug 11, 2025 | Nov 25, 2025 106 days | Not confirmed | Claim service & handlingUnsatisfactory settlement or offerRoofHailWindDeductibleAdjuster's handling | Additional Payment ExpectedInformation furnishedQuestion of fact |
| Aug 8, 2025 | Dec 5, 2025 119 days | Not confirmed | Claim service & handlingClaim denialUnsatisfactory settlement or offerPlumbingFoundation | Contract language / legal issueCompany position upheld |
| Aug 7, 2025 | Dec 16, 2025 131 days | Not confirmed | Unsatisfactory settlement or offerRoofHailDamage disputeAppraisal | Information furnishedAdditional monies receivedQuestion of fact |
| Aug 7, 2025 | Sep 11, 2025 35 days | Not confirmed | Claim service & handlingAppraisal | Contract language / legal issueClaim settledInformation furnished |
| Aug 6, 2025 | Oct 13, 2025 68 days | Not confirmed | Claim service & handlingDelay — claims handlingHailWindAppraisal | Additional monies receivedInformation furnished |
| Aug 5, 2025 | Sep 9, 2025 35 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerDamage disputeAppraisal | Information furnishedCompany position upheldContract language / legal issue |
| Jul 29, 2025 | Sep 22, 2025 55 days | Not confirmed | Claim service & handlingDelay — claims handlingAdjuster's handling | Contract language / legal issueInformation furnished |
| Jul 29, 2025 | Aug 20, 2025 22 days | Confirmed | Claim service & handlingUnsatisfactory settlement or offerRoofHailDamage disputeAdjuster's handling | Corrective action takenClaim settledInformation furnished |
| Jul 24, 2025 | Nov 13, 2025 112 days | Not confirmed | Premium & ratingUse Of Clue Reports | Question of factInformation furnished |
| Jul 24, 2025 | Oct 27, 2025 95 days | Not confirmed | Claim service & handlingDelay — claims handlingWater damageDeductibleAdjuster's handling | Claim settledContract language / legal issueInformation furnished |
| Jul 24, 2025 | Oct 28, 2025 96 days | Confirmed | Claim service & handlingDelay — claims handlingAdjuster's handling | Contract language / legal issueInformation furnishedClaim settled |
| Jul 23, 2025 | Aug 15, 2025 23 days | Not confirmed | Claim service & handlingDelay — claims handlingRoofWater damageAppraisal | Contract language / legal issueInformation furnishedClaim settled |
| Jul 23, 2025 | Oct 28, 2025 97 days | Not confirmed | Claim service & handlingDelay — claims handlingClaim denialRoofHailWater damageWind | Information furnishedContract language / legal issueQuestion of fact |
| Jul 17, 2025 | Nov 10, 2025 116 days | Confirmed | Claim denialRoofHailAppraisalAdjuster's handling | Information furnishedCorrective action takenAdditional monies received |
| Jul 15, 2025 | Oct 20, 2025 97 days | Not confirmed | CancellationPremium & rating | Contract language / legal issueCompany position upheldInformation furnished |
| Jul 15, 2025 | Nov 13, 2025 121 days | Confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerRoofHailWindAppraisal | Corrective action takenQuestion of factClaim settled |
| Jul 14, 2025 | Oct 2, 2025 80 days | Confirmed | Claim service & handlingDelay — claims handlingClaim denialUnsatisfactory settlement or offerRoofHailWindAdjuster's handling | Additional Payment ExpectedAdditional monies receivedClaim settled |
| Jul 14, 2025 | Nov 23, 2025 132 days | Confirmed | Claim service & handlingUnsatisfactory settlement or offerWater damageDamage disputeAppraisalLoss of useAdjuster's handling | Contract language / legal issueClaim settledCorrective action taken |
| Jul 11, 2025 | Oct 31, 2025 112 days | Not confirmed | Claim service & handlingClaim denialHailWindDamage disputeAdjuster's handling | Information furnishedCompany position upheld |
| Jul 9, 2025 | Oct 15, 2025 98 days | Not confirmed | Claim service & handlingDelay — claims handlingClaim denialWater damagePlumbingMoldAdjuster's handling | Question of factCompany position upheldContract language / legal issue |
| Jul 9, 2025 | Sep 24, 2025 77 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerLoss of useAdjuster's handling | Contract language / legal issueInformation furnishedQuestion of fact |
| Jul 7, 2025 | Nov 5, 2025 121 days | Confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerRoofHailWater damageWindDeductibleAppraisalMoldAdjuster's handling | Information furnishedAdditional monies receivedCorrective action taken |
| Jul 7, 2025 | Aug 4, 2025 28 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerRoofHailWindAdjuster's handling | Information furnishedQuestion of factAdditional monies received |
| Jul 3, 2025 | Sep 23, 2025 82 days | Confirmed | Policyholder serviceDelay — policyholder serviceRefund of premium | Premium RefundedCorrective action taken |
| Jun 26, 2025 | Nov 26, 2025 153 days | Not confirmed | Unsatisfactory settlement or offerAdjuster's handling | Information furnishedQuestion of factClaim settled |
| Jun 19, 2025 | Aug 13, 2025 55 days | Confirmed | Claim denialWindAdjuster's handling | Company position upheldContract language / legal issue |
| Jun 17, 2025 | Oct 3, 2025 108 days | Not confirmed | Policyholder serviceDeductible | Information furnishedQuestion of factCompany position upheld |
| Jun 16, 2025 | Oct 20, 2025 126 days | Not confirmed | Claim service & handlingUnsatisfactory settlement or offerRoofHailWater damageDamage disputeDeductible | Contract language / legal issueQuestion of fact |
| Jun 16, 2025 | Sep 19, 2025 95 days | Not confirmed | Claim denialRoofHailAdjuster's handling | Claim settledInformation furnishedCorrective action taken |
| Jun 10, 2025 | Oct 9, 2025 121 days | Not confirmed | Claim service & handlingUnsatisfactory settlement or offerRoofWater damageWindLoss of use | Contract language / legal issueNon-renewal rescindedAdditional monies received |
| Jun 9, 2025 | Oct 8, 2025 121 days | Confirmed | Policyholder serviceUnsatisfactory settlement or offerWindDeductible | Corrective action takenContract language / legal issueAdditional monies received |
| Jun 9, 2025 | Oct 1, 2025 114 days | Not confirmed | Claim denialWater damageDamage disputePlumbing | Company position upheldInformation furnishedContract language / legal issue |
| Jun 3, 2025 | Dec 23, 2025 203 days | Confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerRoofHail | Corrective action takenAdditional monies receivedQuestion of fact |
| Jun 3, 2025 | Oct 22, 2025 141 days | Not confirmed | Claim service & handlingDelay — claims handlingPlumbing | Information furnishedContract language / legal issue |
| Jun 3, 2025 | Oct 3, 2025 122 days | Not confirmed | Claim service & handlingUnsatisfactory settlement or offerDeductibleDepreciationAdjuster's handling | Information furnishedCompany position upheldContract language / legal issue |
| Jun 2, 2025 | Oct 10, 2025 130 days | Not confirmed | Claim service & handlingDelay — claims handlingAppraisal | Question of factAdditional Payment Expected |
| May 24, 2025 | Aug 7, 2025 75 days | Not confirmed | Claim denial | Contract language / legal issueInformation furnishedCompany position upheld |
| May 23, 2025 | Sep 10, 2025 110 days | Not confirmed | Delay — claims handlingUnsatisfactory settlement or offerRoofHailAppraisal | Contract language / legal issueAdditional Payment ExpectedInformation furnished |
| May 20, 2025 | Sep 10, 2025 113 days | Not confirmed | Claim service & handlingPolicyholder serviceDelay — claims handlingUnsatisfactory settlement or offerRoofHailWindDeductible | Contract language / legal issueQuestion of factInformation furnished |
| May 15, 2025 | Aug 9, 2025 86 days | Not confirmed | Unsatisfactory settlement or offerRoofDamage disputeAdjuster's handling | Contract language / legal issueAdditional Payment ExpectedQuestion of fact |