| Jul 6, 2026 | Jul 22, 2026 16 days | Not confirmed | Unsatisfactory settlement or offerRoofHailWindDamage disputeAdjuster's handling | Question of factContract language / legal issueInformation furnished |
| Jul 3, 2026 | Jul 22, 2026 19 days | Not confirmed | Refund of premium | Information furnishedCompany position upheld |
| Jun 23, 2026 | Jul 1, 2026 8 days | Not confirmed | Claim denialRoofWater damageWindLoss of use | Company position upheldInformation furnishedContract language / legal issue |
| Jun 15, 2026 | Jun 26, 2026 11 days | Not confirmed | Misleading Advertising | Information furnished |
| May 29, 2026 | Jun 26, 2026 28 days | Confirmed | Claim service & handlingDelay — claims handlingAppraisal | Contract language / legal issueInformation furnishedCorrective action taken |
| May 5, 2026 | May 29, 2026 24 days | Not confirmed | Claim service & handlingUnsatisfactory settlement or offerRoofHailWater damageDamage disputeDeductible | Contract language / legal issueCompany position upheld |
| Apr 29, 2026 | May 22, 2026 23 days | Not confirmed | Claim service & handlingClaim denialWater damageMold | Contract language / legal issueCompany position upheldInformation furnished |
| Apr 24, 2026 | May 5, 2026 11 days | Not confirmed | Claim denialLiability Dispute | Information furnishedCompany position upheldQuestion of fact |
| Apr 15, 2026 | May 4, 2026 19 days | Confirmed | Policyholder serviceDelay — policyholder serviceRefund of premium | Contract language / legal issueCorrective action takenPremium Refunded |
| Apr 10, 2026 | May 1, 2026 21 days | Not confirmed | Claim service & handlingClaim denialUnsatisfactory settlement or offerPlumbingFoundationAdjuster's handling | Question of factContract language / legal issue |
| Mar 30, 2026 | Apr 15, 2026 16 days | Not confirmed | Claim service & handlingUnsatisfactory settlement or offerRoofWater damageWindDeductibleAdjuster's handling | Information furnishedContract language / legal issueCompany position upheld |
| Mar 19, 2026 | Apr 16, 2026 28 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerRoof | Additional Payment ExpectedContract language / legal issueCompany position upheld |
| Mar 12, 2026 | Apr 13, 2026 32 days | Confirmed | Policyholder serviceDelay — policyholder serviceRefund of premium | Premium RefundedInformation furnishedCorrective action taken |
| Feb 26, 2026 | Apr 1, 2026 34 days | Not confirmed | Delay — claims handlingClaim denialHailDamage disputeAdjuster's handling | Question of factContract language / legal issueCompany position upheld |
| Feb 24, 2026 | Mar 25, 2026 29 days | Not confirmed | Claim service & handlingWater damageWindDamage disputeAdjuster's handling | Contract language / legal issueQuestion of factCompany position upheld |
| Feb 24, 2026 | Apr 10, 2026 45 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offer | Contract language / legal issueQuestion of fact |
| Feb 20, 2026 | Mar 23, 2026 31 days | Not confirmed | Claim denialAdjuster's handling | Contract language / legal issueCompany position upheldInformation furnished |
| Feb 19, 2026 | Apr 1, 2026 41 days | Confirmed | Claim service & handlingDelay — claims handlingClaim denialRoofHailDamage dispute | Claim settledAdditional monies receivedCorrective action taken |
| Feb 16, 2026 | Mar 23, 2026 35 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerAdjuster's handling | Question of factContract language / legal issueCompany position upheld |
| Jan 30, 2026 | Feb 26, 2026 27 days | Confirmed | Claim service & handlingClaim denialAdjuster's handling | Claim settledCorrective action taken |
| Dec 29, 2025 | Jan 12, 2026 14 days | Not confirmed | CancellationRoof | Company position upheldInformation furnishedContract language / legal issue |
| Dec 9, 2025 | Feb 6, 2026 59 days | Not confirmed | Claim service & handlingDelay — claims handlingAppraisalAdjuster's handling | Question of factInformation furnished |
| Dec 1, 2025 | Jan 21, 2026 51 days | Not confirmed | Delay — policyholder serviceRefund of premium | Premium RefundedContract language / legal issue |
| Nov 26, 2025 | Jan 30, 2026 65 days | Not confirmed | Policyholder serviceRefund of premium | Premium Refunded |
| Nov 21, 2025 | Feb 6, 2026 77 days | Not confirmed | Claim service & handlingClaim denialWater damageDamage disputeAdjuster's handling | Contract language / legal issueAdditional Payment ExpectedQuestion of fact |
| Nov 17, 2025 | Feb 5, 2026 80 days | Not confirmed | Policyholder serviceDelay — policyholder serviceRefund of premium | Contract language / legal issueQuestion of factCompany position upheld |
| Oct 23, 2025 | Dec 18, 2025 56 days | Not confirmed | Claim service & handlingDelay — claims handlingRoofHailWind | Question of factInformation furnished |
| Oct 17, 2025 | Jan 12, 2026 87 days | Confirmed | Claim service & handlingDelay — claims handlingClaim denialRoofHailWater damageDamage disputeAdjuster's handling | Corrective action takenInformation furnishedAdditional monies received |
| Oct 8, 2025 | Oct 31, 2025 23 days | Confirmed | Claim service & handlingClaim denialRoofHailAdjuster's handling | Claim settledCorrective action takenInformation furnished |
| Oct 8, 2025 | Dec 12, 2025 65 days | Not confirmed | Claim service & handlingClaim denialAdjuster's handling | Contract language / legal issueInformation furnishedQuestion of fact |
| Oct 8, 2025 | Oct 31, 2025 23 days | Not confirmed | Claim service & handlingDelay — claims handlingAdjuster's handling | Contract language / legal issueQuestion of factInformation furnished |
| Oct 6, 2025 | Jan 14, 2026 100 days | Confirmed | Claim service & handlingClaim denial | Claim settledCorrective action taken |
| Oct 2, 2025 | Oct 24, 2025 22 days | Confirmed | Delay — claims handlingRoofHailAdjuster's handling | Claim settledInformation furnishedContract language / legal issue |
| Sep 18, 2025 | Oct 22, 2025 34 days | Not confirmed | Claim service & handlingDelay — claims handlingLoss of useAdjuster's handling | Additional Payment ExpectedQuestion of factContract language / legal issue |
| Sep 17, 2025 | Oct 13, 2025 26 days | Not confirmed | Claim service & handlingClaim denialWater damageAdjuster's handling | Company position upheldComplaint Withdrawn |
| Sep 15, 2025 | Nov 14, 2025 60 days | Not confirmed | Unsatisfactory settlement or offer | Question of factInformation furnished |
| Aug 25, 2025 | Nov 25, 2025 92 days | Not confirmed | Claim service & handlingClaim denialNon-RenewalRoofHailWindMoldAdjuster's handling | Question of factContract language / legal issueCompany position upheld |
| Aug 12, 2025 | Dec 5, 2025 115 days | Not confirmed | Delay — claims handlingUnsatisfactory settlement or offer | Contract language / legal issueQuestion of fact |
| Aug 8, 2025 | Sep 17, 2025 40 days | Not confirmed | Claim denial | Company position upheldQuestion of factContract language / legal issue |
| Aug 5, 2025 | Nov 25, 2025 112 days | Not confirmed | Unsatisfactory settlement or offerWater damageDamage disputePlumbingMold | Contract language / legal issueQuestion of fact |
| Jul 31, 2025 | Sep 15, 2025 46 days | Not confirmed | Claim service & handlingDelay — claims handlingPolicy ExclusionUnsatisfactory settlement or offerRoofHailWindDamage disputeAdjuster's handling | Company position upheldContract language / legal issueInformation furnished |
| Jul 28, 2025 | Sep 24, 2025 58 days | Confirmed | Unsatisfactory settlement or offerHail | Claim settledCorrective action takenContract language / legal issue |
| Jul 23, 2025 | Aug 19, 2025 27 days | Not confirmed | Claim denialRoofAdjuster's handling | Contract language / legal issueQuestion of factInformation furnished |
| Jul 23, 2025 | Sep 4, 2025 43 days | Not confirmed | Claim service & handlingUnsatisfactory settlement or offerWater damageDeductibleAdjuster's handling | Additional Payment ExpectedContract language / legal issue |
| Jul 22, 2025 | Nov 14, 2025 115 days | Not confirmed | Claim denialRoofHailAdjuster's handling | Company position upheldContract language / legal issueInformation furnished |
| Jul 17, 2025 | Sep 30, 2025 75 days | Confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerRoofHailAdjuster's handling | Claim settledInformation furnishedCorrective action taken |
| Jul 16, 2025 | Aug 8, 2025 23 days | Not confirmed | Claim service & handlingUnsatisfactory settlement or offerAppraisalAdjuster's handling | Information furnishedAdditional monies received |
| Jul 16, 2025 | Dec 8, 2025 145 days | Confirmed | Unsatisfactory settlement or offerRoofHailWater damageDamage dispute | Question of factCorrective action takenClaim settled |
| Jul 15, 2025 | Nov 13, 2025 121 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerWater damagePlumbingAdjuster's handling | Question of factContract language / legal issueCompany position upheld |
| Jul 11, 2025 | Nov 17, 2025 129 days | Not confirmed | Claim service & handlingDelay — claims handlingEndorsement / RiderNon-RenewalUnsatisfactory settlement or offer | Company position upheldInformation furnishedContract language / legal issue |
| Jul 7, 2025 | Oct 29, 2025 114 days | Not confirmed | Claim denialWater damagePlumbingMold | Question of factCompany position upheldContract language / legal issue |
| Jun 20, 2025 | Sep 30, 2025 102 days | Confirmed | Claim service & handlingClaim denialRoofHail | Corrective action takenContract language / legal issueClaim settled |
| Jun 12, 2025 | Oct 10, 2025 120 days | Not confirmed | Refusal to Insure | Contract language / legal issueInformation furnishedCompany position upheld |
| Jun 6, 2025 | Oct 22, 2025 138 days | Not confirmed | Delay — claims handlingAppraisalAdjuster's handling | Appraisal Process InvokedAdditional Payment ExpectedContract language / legal issue |
| Jun 5, 2025 | Aug 11, 2025 67 days | Confirmed | Claim service & handlingDelay — claims handlingHailAdjuster's handling | Information furnishedAdditional monies receivedCorrective action taken |
| Jun 4, 2025 | Oct 8, 2025 126 days | Confirmed | Claim service & handlingAdjuster's handling | Information furnishedCorrective action taken |
| May 20, 2025 | Jun 18, 2025 29 days | Confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerAdjuster's handling | Claim settledContract language / legal issueInformation furnished |
| May 16, 2025 | Sep 9, 2025 116 days | Not confirmed | CancellationDelay — policyholder serviceRoof | Contract language / legal issueInformation furnishedPolicy Issued/Restored |
| May 16, 2025 | Oct 3, 2025 140 days | Confirmed | Claim service & handlingUnsatisfactory settlement or offerWater damageDamage disputePlumbingMold | Information furnishedCompany position upheldContract language / legal issue |
| May 8, 2025 | May 29, 2025 21 days | Confirmed | CancellationDelays (Underwriting)Roof | Contract language / legal issuePolicy Issued/RestoredInformation furnished |
| May 2, 2025 | Jul 31, 2025 90 days | Confirmed | Claim service & handlingRoofHailAdjuster's handling | Corrective action takenInformation furnished |
| Apr 29, 2025 | Aug 26, 2025 119 days | Confirmed | Claim service & handlingUnsatisfactory settlement or offerWater damagePlumbingDeductibleFoundationAdjuster's handling | Contract language / legal issueQuestion of factCorrective action taken |
| Apr 25, 2025 | Jun 25, 2025 61 days | Confirmed | Delay — policyholder serviceRefund of premium | Information furnishedPremium RefundedCorrective action taken |
| Apr 21, 2025 | Jul 15, 2025 85 days | Not confirmed | Claim denialAdjuster's handling | Additional Payment ExpectedContract language / legal issueQuestion of fact |
| Apr 14, 2025 | Aug 6, 2025 114 days | Not confirmed | Claim service & handlingClaim denialRoofWindAdjuster's handling | Question of factCompany position upheldContract language / legal issue |
| Apr 11, 2025 | Aug 5, 2025 116 days | Confirmed | Claim service & handlingDelay — claims handlingRoofHailWater damageMoldAdjuster's handling | Additional Payment ExpectedQuestion of factContract language / legal issue |
| Apr 2, 2025 | Jul 15, 2025 104 days | Not confirmed | Cancellation | Company position upheldInformation furnishedContract language / legal issue |
| Mar 25, 2025 | Jul 22, 2025 119 days | Confirmed | Claim service & handlingDelay — claims handlingAppraisalLoss of useAdjuster's handling | Additional monies receivedContract language / legal issueClaim settled |
| Mar 25, 2025 | Jul 23, 2025 120 days | Confirmed | Claim denialRoofWater damageWindLoss of use | Contract language / legal issueAdditional Payment ExpectedCorrective action taken |
| Mar 17, 2025 | Aug 28, 2025 164 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerRoofWindLoss of useAdjuster's handling | Contract language / legal issueCompany position upheldInformation furnished |
| Mar 7, 2025 | Apr 18, 2025 42 days | Not confirmed | Claim service & handlingUnsatisfactory settlement or offerRoofAdjuster's handling | Claim settledInformation furnishedQuestion of fact |
| Mar 3, 2025 | Mar 25, 2025 22 days | Not confirmed | Policyholder serviceOther | Question of factCompany position upheld |
| Feb 26, 2025 | Mar 17, 2025 19 days | Not confirmed | Claim service & handlingClaim denialAdjuster's handling | Contract language / legal issueInformation furnishedQuestion of fact |
| Feb 20, 2025 | May 15, 2025 84 days | Not confirmed | Claim denial | Company position upheldInformation furnishedContract language / legal issue |
| Feb 20, 2025 | Jun 3, 2025 103 days | Not confirmed | Delays (Underwriting)Endorsement / RiderWater damage | Company position upheldContract language / legal issueInformation furnished |
| Feb 4, 2025 | Feb 21, 2025 17 days | Not confirmed | Cancellation | Information furnishedCancellation Withdrawn |
| Feb 4, 2025 | Apr 25, 2025 80 days | Not confirmed | Policyholder serviceNon-RenewalRoof | Company position upheldQuestion of factContract language / legal issue |
| Feb 3, 2025 | May 14, 2025 100 days | Not confirmed | Policyholder serviceDelays (Underwriting)Misrepresentation | Contract language / legal issueCompany position upheldInformation furnished |
| Jan 31, 2025 | Jul 21, 2025 171 days | Not confirmed | Premium & rating | Information furnishedCompany position upheld |
| Jan 29, 2025 | Jun 24, 2025 146 days | Not confirmed | CancellationPolicyholder serviceRoof | Contract language / legal issueInformation furnishedCompany position upheld |
| Jan 24, 2025 | Apr 7, 2025 73 days | Not confirmed | Premium & rating | Information furnishedReferred ToCompany position upheld |
| Jan 23, 2025 | Feb 26, 2025 34 days | Not confirmed | Claim service & handlingUnsatisfactory settlement or offerRoofHailWind | Information furnishedCompany position upheldContract language / legal issue |
| Jan 22, 2025 | Apr 25, 2025 93 days | Not confirmed | Claim service & handlingUnsatisfactory settlement or offerWater damageFoundationAdjuster's handling | Information furnishedCompany position upheldContract language / legal issue |
| Jan 21, 2025 | May 1, 2025 100 days | Not confirmed | CancellationPolicyholder serviceDelays (Underwriting)Roof | Contract language / legal issueCompany position upheldInformation furnished |
| Jan 9, 2025 | May 28, 2025 139 days | Confirmed | Claim service & handlingDelay — claims handlingRoofHailWindDeductibleAppraisalDepreciationAdjuster's handling | Additional monies receivedAdditional Payment ExpectedCorrective action taken |
| Jan 9, 2025 | May 22, 2025 133 days | Not confirmed | Policyholder serviceDelay — policyholder servicePremium & ratingRefund of premium | Contract language / legal issueQuestion of factPremium Refunded |
| Jan 7, 2025 | Jun 11, 2025 155 days | Not confirmed | Claim service & handlingClaim denialWater damageAdjuster's handling | Information furnishedCompany position upheldContract language / legal issue |
| Dec 27, 2024 | May 6, 2025 130 days | Not confirmed | Unsatisfactory settlement or offerRoofHailWind | Information furnishedContract language / legal issueQuestion of fact |
| Dec 9, 2024 | Feb 12, 2025 65 days | Not confirmed | CancellationPolicyholder serviceRoof | Company position upheldInformation furnishedContract language / legal issue |
| Nov 4, 2024 | May 2, 2025 179 days | Not confirmed | Claim service & handlingUnsatisfactory settlement or offerRoofAppraisalAdjuster's handling | Claim settledContract language / legal issueInformation furnished |
| Nov 1, 2024 | May 2, 2025 182 days | Not confirmed | Claim service & handlingDelay — claims handlingRoofHailWater damageDepreciationAdjuster's handling | Information furnishedClaim settledQuestion of fact |
| Oct 30, 2024 | Jan 28, 2025 90 days | Confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerRoofHailDamage disputeAdjuster's handling | Information furnishedAdditional Payment Expected |
| Oct 24, 2024 | Apr 1, 2025 159 days | Not confirmed | CancellationClaim service & handlingClaim denialUnsatisfactory settlement or offerRoofAdjuster's handling | Contract language / legal issueCompany position upheldInformation furnished |
| Oct 17, 2024 | Jan 27, 2025 102 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerAdjuster's handling | Question of factAdditional monies receivedContract language / legal issue |
| Oct 14, 2024 | Jan 16, 2025 94 days | Confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerRoofHailAdjuster's handling | Information furnishedClaim settledCorrective action taken |
| Oct 3, 2024 | Feb 3, 2025 123 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerHailWindDamage disputeDeductibleDepreciationLoss of useAdjuster's handling | Company position upheldClaim settledContract language / legal issue |
| Oct 2, 2024 | Oct 18, 2024 16 days | Not confirmed | Policyholder serviceDelay — policyholder serviceRefund of premium | Premium RefundedContract language / legal issue |
| Sep 19, 2024 | Nov 21, 2024 63 days | Not confirmed | Claim denialWater damagePlumbing | Contract language / legal issueInformation furnishedCompany position upheld |
| Sep 17, 2024 | Oct 9, 2024 22 days | Not confirmed | Claim service & handlingClaim denialWater damagePlumbingMoldAdjuster's handling | Company position upheldContract language / legal issue |
| Sep 11, 2024 | Jan 14, 2025 125 days | Not confirmed | Claim denialWater damagePlumbingMoldAdjuster's handling | Information furnishedCompany position upheldContract language / legal issue |
| Aug 29, 2024 | Jan 8, 2025 132 days | Not confirmed | Premium & ratingUse Of Clue Reports | Contract language / legal issueCompany position upheldInformation furnished |
| Aug 29, 2024 | Apr 17, 2025 231 days | Not confirmed | CancellationPolicyholder serviceNotice Requirements | Information furnishedQuestion of factCompany position upheld |
| Aug 27, 2024 | Nov 8, 2024 73 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerRoofAdjuster's handling | Contract language / legal issueInformation furnished |
| Aug 26, 2024 | Nov 26, 2024 92 days | Not confirmed | Claim service & handlingDelay — claims handlingClaim denialWater damagePlumbingAdjuster's handling | Contract language / legal issueQuestion of factCompany position upheld |
| Aug 26, 2024 | Dec 9, 2024 105 days | Confirmed | CancellationClaim denialWind | Question of factAdditional monies receivedPolicy Issued/Restored |
| Aug 19, 2024 | Dec 11, 2024 114 days | Not confirmed | Claim service & handlingDelay — claims handlingUnsatisfactory settlement or offerWater damagePlumbingLoss of useMoldAdjuster's handling | Question of factContract language / legal issueCompany position upheld |
| Aug 19, 2024 | Dec 19, 2024 122 days | Confirmed | Unsatisfactory settlement or offerRoofHailWindDamage disputeAppraisalAdjuster's handling | Claim settledAdditional Payment ExpectedCorrective action taken |
| Aug 16, 2024 | Apr 25, 2025 252 days | Not confirmed | Unsatisfactory settlement or offerRoofHailWater damageWindAdjuster's handling | Information furnishedCompany position upheld |
| Aug 7, 2024 | Nov 27, 2024 112 days | Not confirmed | Claim denialWater damagePlumbingMoldFoundation | Company position upheldInformation furnishedQuestion of fact |
| Aug 6, 2024 | Oct 31, 2024 86 days | Not confirmed | Premium & ratingRefund of premium | Company position upheldInformation furnishedContract language / legal issue |
| Aug 1, 2024 | Oct 23, 2024 83 days | Not confirmed | Unsatisfactory settlement or offerRoofHailWindDamage dispute | Information furnishedAdditional Payment Expected |
| Jul 30, 2024 | Oct 11, 2024 73 days | Not confirmed | Delay — claims handlingAdjuster's handling | Contract language / legal issueInformation furnished |
| Jul 25, 2024 | Jan 27, 2025 186 days | Not confirmed | Claim service & handlingUnsatisfactory settlement or offerRoofHailPlumbingAdjuster's handling | Contract language / legal issueCompany position upheldInformation furnished |
| Jul 22, 2024 | Sep 17, 2024 57 days | Not confirmed | Use of Credit Reports | Company position upheldInformation furnished |
| Jul 15, 2024 | Nov 7, 2024 115 days | Not confirmed | Claim denialLiability DisputeRoofWindAdjuster's handling | Information furnishedCompany position upheldQuestion of fact |
| Jul 5, 2024 | Oct 14, 2024 101 days | Confirmed | Claim service & handlingDelay — claims handlingHailWater damageWindMoldAdjuster's handling | Information furnishedAdditional monies receivedCorrective action taken |
| Jul 3, 2024 | Jul 22, 2024 19 days | Confirmed | CancellationPolicyholder serviceDelay — policyholder serviceDelays (Underwriting) | Premium RefundedInformation furnishedCorrective action taken |
| Jul 2, 2024 | Sep 30, 2024 90 days | Not confirmed | Delay — policyholder serviceRefund of premium | Company position upheldContract language / legal issueInformation furnished |
| Jun 21, 2024 | Aug 23, 2024 63 days | Not confirmed | Claim service & handlingClaim denialRoofHailAdjuster's handling | Contract language / legal issueQuestion of factInformation furnished |
| Jun 20, 2024 | Oct 17, 2024 119 days | Confirmed | Policyholder serviceRefund of premium | Information furnishedCorrective action taken |