Field note

Xactimate Scope Gaps: Sorting a Measurement Fight From a Coverage Fight

One phrase covers a quantity fight, a code fight, and a coverage fight. Only the first is decided on the roof.

By Andy Rouhafzai, Founder3 min read

Photo: FEMA / Win Henderson — public domain

Moore, Oklahoma, May 26, 2010. A FEMA public-assistance officer and a roofing foreman from the Moore Public School System stood on a school roof, looking at hail damage to a rooftop air-conditioning unit.1 Nobody had hidden that unit. The estimate was written from the ground.

Every adjuster keeps a running list of what carriers leave off. Starter strip. Ridge cap run along the ridge but not the hips. Drip edge at the eaves and nowhere else. Detach-and-reset on a satellite dish that has to come off before tear-off anyway. Those lists are accurate and they circulate freely, and they stop just short of the thing that decides the money: which argument the missing line belongs to.

A supplement that sends every omission through one channel arrives as a single request. A desk adjuster who disagrees with any part of it then has a tidy reason to pay the middle and close the file.

Sort the gap before you write the supplement

Three arguments hide inside the phrase "missing line item," and each one is won with a different attachment.

What each kind of scope gap actually needs
What's missingThe actual disputeWhat settles it
Short quantity — squares, LF of ridge, waste factorMeasurementAerial report or your own diagram, with the roof plan attached
Code item the old roof never had — drip edge, ice barrierCode complianceThe adopted code section, plus the permit or inspector's correction notice
Code item the carrier agrees is required but will not payCoverageThe ordinance or law endorsement and its limit, read off the declarations

The quantity fight is arithmetic, and it settles fastest. Send the measurement, show the math, and a reasonable desk adjuster corrects the number without much ceremony. That work starts on the roof, which is why documenting a hail roof so it survives re-inspection pays for itself twice.

The code fight runs slower. A code item comes from the jurisdiction rather than from the storm, so a photograph of the eave proves nothing about it. The 2021 IRC requires a drip edge at the eaves and gables of shingle roofs, and requires it regardless of what the original roof had.2 Ice barrier carries the same shape of obligation, triggered by a local history of ice forming along the eaves rather than by anything this loss did.3 Both lines get paid off the adopted section and the permit that enforces it.

Why the code line is really a coverage question

Once a carrier concedes the code requires the item, the argument leaves the roof entirely. Ordinance or law protection rides on an endorsement. The NAIC lists it among the ways a homeowner increases coverage, and describes it as paying the extra expense of rebuilding to codes that did not exist when the home was built.4 A policy carrying no such endorsement can accept every code citation you send and still owe nothing toward the upgrade.

What the code section will never tell you is the limit. Endorsement limits are commonly written as a percentage of the dwelling amount, and that percentage moves from policy to policy, so the declarations page decides how much of a code-compliant rebuild is actually recoverable. Read it before you promise the insured a roof built to current code.

Which inverts the order most supplements get written in. Declarations first, then the adopted code section, then the measurement — because the measurement argument is the only one of the three that a photograph and a diagram can win on their own. The other two are settled in documents that were sitting in the file before anyone climbed a ladder, and the labor of pulling them is smaller than the labor of a second supplement. When the quantity argument is the one in play, the overhead and profit question usually rides along with it, and it answers to a different test again. None of the sorting makes a carrier pay an item it has decided to fight, and a file that separates the arguments cleanly still loses some of them. What the sorting changes is what comes back: a denial that names the roof, or a denial that names the policy. Those go to different places. The first returns to the measurement and to a re-inspection you can prepare for; the second goes to the declarations page and, if the endorsement is there and the limit has room, into a demand letter that quotes the endorsement rather than the code.

Is a missing drip edge a scope gap or a code upgrade?

It depends on the roof. If the original roof had drip edge and the estimate omitted it, the dispute is scope and the fix is a corrected quantity. If the original roof never had one and the current adopted code requires it, the dispute is code compliance, and payment turns on whether the policy carries ordinance or law coverage.

Does the carrier have to pay for code upgrades on a roof replacement?

No, not from the code alone. The adopted code establishes that the work is required. Whether the extra expense is recoverable depends on the ordinance or law endorsement on the policy and the limit written into it.

What single document moves a code-item supplement fastest?

The permit or the inspector's correction notice. It converts the code section from an argument about interpretation into a record of what the jurisdiction is actually enforcing on this address.

Should quantity, code, and coverage items go in one supplement?

Separate them, or at least label them separately inside one package. Each is decided by a different person against a different standard, and bundling them lets a partial payment look like a complete answer.

Sources cited

  1. Preliminary Damage Assessment partners on a roof in Moore, Oklahoma (May 26, 2010)FEMA Photo Library via Wikimedia Commons
  2. 2021 International Residential Code R905.2.8.5 — Drip edgeInternational Code Council
  3. 2021 International Residential Code R905.1.2 — Ice barriersInternational Code Council
  4. A Consumer's Guide to Home InsuranceNational Association of Insurance Commissioners

The documentation lives where the claim does.

Photos, drying logs, scopes, and carrier correspondence land on the claim record as they happen, so the package you send the carrier is the file you actually worked.